Skip to product information
1 of 10

Garmin Bounce™ 2, Kids Smartwatch, Calling & Texting, 43mm, Light Purple | Two-Way Calling, Voice Messaging, Text Messaging, Real-Time Location Tracking, Active Subsciption Required for LTE Features

Regular price $299.99
Sale price $299.99 Regular price
GarminSmartwatch

Model: 010-03399-01

Bounce™ 2 is the kids smartwatch with two-way calling, text messaging and real-time location tracking that parents have been waiting for (an active subscription and LTE connectivity are required). Kids can track their activity, listen to music (subscription required) and even manage chores and rewards — all on a bright, colorful AMOLED display smartwatch...

Key features

  • Operating System: Garmin OS
  • Memory Storage Capacity: 4 GB
  • Battery Capacity: 226 milliamp_hours
  • Wireless Communication Standard: Bluetooth
Out of stock

Sorry, it's out of stock.

But we can let you know when it's back in.

Payment methods
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Product information

Everything you need to know

Explore the full description, technical specifications, package contents and shipping information.

Connectivity
Bluetooth, USB, GPS
Colour
Purple

Bounce™ 2 is the kids smartwatch with two-way calling, text messaging and real-time location tracking that parents have been waiting for (an active subscription and LTE connectivity are required). Kids can track their activity, listen to music (subscription required) and even manage chores and rewards — all on a bright, colorful AMOLED display smartwatch that’s swim-friendly. Parents will love the Garmin Jr.™ smartphone app that allows them to keep track of, and chat with, their child. Up to 2 days of battery life will keep Bounce 2 off the charger and on their wrist longer (connected feature use significantly impacts battery life). And preloaded sports apps and step tracking will help keep kids active.

Product Overview

  • Operating System: Garmin OS
  • Memory Storage Capacity: 4 GB
  • Special Feature: Activity Tracker, Alarm Clock, Time Display, Touchscreen
  • Battery Capacity: 226 milliamp_hours
  • Connectivity Technology: Bluetooth, USB
  • Wireless Communication Standard: Bluetooth
  • Battery Cell Composition: Lithium Ion
  • GPS: Built-in GPS
  • Shape: Round
  • Screen Size: 1.2 inches

Product Features

  • Real-time location tracking lets parents check in on their child’s whereabouts through the Garmin Jr. smartphone app and even receive alerts when their child enters or leaves parent-defined boundaries (an active subscription and LTE connectivity are required)
  • Up to 2 days of battery life means less time charging and more time wearing (connected feature use significantly impacts battery life)
  • Two-way calling and voice messaging between the Bounce 2 smartwatch and the Garmin Jr. smartphone app let parents and kids stay in contact easily (an active subscription and LTE connectivity are required)
  • Easily send text messages between the Bounce 2 smartwatch and the Garmin Jr. smartphone app (an active subscription and LTE connectivity are required)
  • For added peace of mind, the assistance feature lets children quickly trigger a message with their live location and a call to their family contacts (requires setup and your child to be in an area with data network coverage)
  • No need to switch phone providers; the Bounce 2 smartwatch’s LTE connectivity subscription is managed by Garmin
  • Built-in sports apps use GPS to track running, biking, pool swimming and more
  • Let your kids jam out to their favorite tunes through their watch or compatible headphones (Amazon Music Unlimited or Amazon Prime subscription required)
  • Kids can use voice commands to activate their smartwatch and even place calls
  • Parents can use the Garmin Jr. smartphone app to assign tasks that kids can check off on their devices as they complete them; schedule alerts and alarms, track steps, monitor sleep, and reward them for good behavior (data presented is intended to be a close estimation of metrics tracked); even enable school mode to lock distracting features during designated times

Product Information

Operating System Garmin OS
Additional Features Activity Tracker, Alarm Clock, Time Display, Touchscreen
GPS Geotagging Functionality Built-in GPS
Band Material Type Silicone
Case Material Type Acrylonitrile Butadiene Styrene (ABS)
Water Resistance Level Water Resistant
Sport Type Fitness
Human Interface Input Buttons, Touchscreen
Clasp Type Tang Buckle
Supported Application Alarm, GPS, Messages, Multisport Tracker, Time Display
Water Resistance Depth 50 meters
Supported Satellite Navigation System GPS
Metrics Measured Calories Burned, Distance, Step Count
Closure Type Buckle
Shape Round
Style Name Hybrid
Color Light Purple
Band Color Purple
Connectivity Technology Bluetooth, USB
Wireless Compability Bluetooth
Wireless Provider Unlocked
Cellular Technology 4G
Communication Feature Notification, Voice Call
Band Width 20 millimeters
Item Weight 1.4 ounces
Item Dimensions 1.69 x 1.69 x 0.49 inches
Brand Garmin
Model Name Garmin Bounce 2
Target Audience Boys, Girls, Unisex Kids, Unisex Youth
Age Range Description Kid
Model Number 010-03399-01
Built-In Media Bounce 2, Charging Cable, Documentation
Warranty Description 1 Year Limited Warranty
Wearable Computer Type Smart Watch
UPC 753759349431
Global Trade Identification Number 00753759349431
Manufacturer Garmin

Battery Capacity 226 milliamp_hours
Battery Cell Type Lithium Ion
Battery Average Life 2 days
Screen Size 1.2 inches
Display Type AMOLED
Compatible Devices Laptop, PC, Smartphone, Tablet
Compatible Phone Models Android Devices, iOS Devices
Memory Storage Capacity 4 GB
RAM Memory Installed 4 GB
Warranty Type 1 Year Limited Warranty
Description

Bounce™ 2 is the kids smartwatch with two-way calling, text messaging and real-time location tracking that parents have been waiting for (an active subscription and LTE connectivity are required). Kids can track their activity, listen to music (subscription required) and even manage chores and rewards — all on a bright, colorful AMOLED display smartwatch that’s swim-friendly. Parents will love the Garmin Jr.™ smartphone app that allows them to keep track of, and chat with, their child. Up to 2 days of battery life will keep Bounce 2 off the charger and on their wrist longer (connected feature use significantly impacts battery life). And preloaded sports apps and step tracking will help keep kids active.

Product Overview

  • Operating System: Garmin OS
  • Memory Storage Capacity: 4 GB
  • Special Feature: Activity Tracker, Alarm Clock, Time Display, Touchscreen
  • Battery Capacity: 226 milliamp_hours
  • Connectivity Technology: Bluetooth, USB
  • Wireless Communication Standard: Bluetooth
  • Battery Cell Composition: Lithium Ion
  • GPS: Built-in GPS
  • Shape: Round
  • Screen Size: 1.2 inches

Product Features

  • Real-time location tracking lets parents check in on their child’s whereabouts through the Garmin Jr. smartphone app and even receive alerts when their child enters or leaves parent-defined boundaries (an active subscription and LTE connectivity are required)
  • Up to 2 days of battery life means less time charging and more time wearing (connected feature use significantly impacts battery life)
  • Two-way calling and voice messaging between the Bounce 2 smartwatch and the Garmin Jr. smartphone app let parents and kids stay in contact easily (an active subscription and LTE connectivity are required)
  • Easily send text messages between the Bounce 2 smartwatch and the Garmin Jr. smartphone app (an active subscription and LTE connectivity are required)
  • For added peace of mind, the assistance feature lets children quickly trigger a message with their live location and a call to their family contacts (requires setup and your child to be in an area with data network coverage)
  • No need to switch phone providers; the Bounce 2 smartwatch’s LTE connectivity subscription is managed by Garmin
  • Built-in sports apps use GPS to track running, biking, pool swimming and more
  • Let your kids jam out to their favorite tunes through their watch or compatible headphones (Amazon Music Unlimited or Amazon Prime subscription required)
  • Kids can use voice commands to activate their smartwatch and even place calls
  • Parents can use the Garmin Jr. smartphone app to assign tasks that kids can check off on their devices as they complete them; schedule alerts and alarms, track steps, monitor sleep, and reward them for good behavior (data presented is intended to be a close estimation of metrics tracked); even enable school mode to lock distracting features during designated times

Product Information

Operating System Garmin OS
Additional Features Activity Tracker, Alarm Clock, Time Display, Touchscreen
GPS Geotagging Functionality Built-in GPS
Band Material Type Silicone
Case Material Type Acrylonitrile Butadiene Styrene (ABS)
Water Resistance Level Water Resistant
Sport Type Fitness
Human Interface Input Buttons, Touchscreen
Clasp Type Tang Buckle
Supported Application Alarm, GPS, Messages, Multisport Tracker, Time Display
Water Resistance Depth 50 meters
Supported Satellite Navigation System GPS
Metrics Measured Calories Burned, Distance, Step Count
Closure Type Buckle
Shape Round
Style Name Hybrid
Color Light Purple
Band Color Purple
Connectivity Technology Bluetooth, USB
Wireless Compability Bluetooth
Wireless Provider Unlocked
Cellular Technology 4G
Communication Feature Notification, Voice Call
Band Width 20 millimeters
Item Weight 1.4 ounces
Item Dimensions 1.69 x 1.69 x 0.49 inches
Brand Garmin
Model Name Garmin Bounce 2
Target Audience Boys, Girls, Unisex Kids, Unisex Youth
Age Range Description Kid
Model Number 010-03399-01
Built-In Media Bounce 2, Charging Cable, Documentation
Warranty Description 1 Year Limited Warranty
Wearable Computer Type Smart Watch
UPC 753759349431
Global Trade Identification Number 00753759349431
Manufacturer Garmin

Battery Capacity 226 milliamp_hours
Battery Cell Type Lithium Ion
Battery Average Life 2 days
Screen Size 1.2 inches
Display Type AMOLED
Compatible Devices Laptop, PC, Smartphone, Tablet
Compatible Phone Models Android Devices, iOS Devices
Memory Storage Capacity 4 GB
RAM Memory Installed 4 GB
Warranty Type 1 Year Limited Warranty
Specifications
Operating System
Garmin OS
Additional Features
Activity Tracker, Alarm Clock, Time Display, Touchscreen
GPS Geotagging Functionality
Built-in GPS
Band Material Type
Silicone
Case Material Type
Acrylonitrile Butadiene Styrene (ABS)
Water Resistance Level
Water Resistant
Sport Type
Fitness
Human Interface Input
Buttons, Touchscreen
Clasp Type
Tang Buckle
Supported Application
Alarm, GPS, Messages, Multisport Tracker, Time Display
Water Resistance Depth
50 meters
Supported Satellite Navigation System
GPS
Metrics Measured
Calories Burned, Distance, Step Count
Closure Type
Buckle
Shape
Round
Style Name
Hybrid
Color
Light Purple
Band Color
Purple
Connectivity Technology
Bluetooth, USB
Wireless Compability
Bluetooth
Wireless Provider
Unlocked
Cellular Technology
4G
Communication Feature
Notification, Voice Call
Band Width
20 millimeters
Item Weight
1.4 ounces
Item Dimensions
1.69 x 1.69 x 0.49 inches
Brand
Garmin
Model Name
Garmin Bounce 2
Target Audience
Boys, Girls, Unisex Kids, Unisex Youth
Age Range Description
Kid
Model Number
010-03399-01
Built-In Media
Bounce 2, Charging Cable, Documentation
Warranty Description
1 Year Limited Warranty
Wearable Computer Type
Smart Watch
UPC
753759349431
Global Trade Identification Number
00753759349431
Manufacturer
Garmin
Battery Capacity
226 milliamp_hours
Battery Cell Type
Lithium Ion
Battery Average Life
2 days
Screen Size
1.2 inches
Display Type
AMOLED
Compatible Devices
Laptop, PC, Smartphone, Tablet
Compatible Phone Models
Android Devices, iOS Devices
Memory Storage Capacity
4 GB
RAM Memory Installed
4 GB
Warranty Type
1 Year Limited Warranty
What's included
• Bounce 2
• Charging Cable
• Documentation
Shipping

Every order includes free next-day shipping. The delivery service and $0 shipping charge are confirmed at checkout.